Industrial Project Contracting

Electrical scope on industrial projects, from design and specification through installation, testing and handover.

Overview

Industrial electrical work is a project discipline. It involves the supply and distribution arrangements for machinery and process equipment, the control and protection of motors and drives, the containment and cabling that carries power and control around a plant, and the documentation that lets the installation be operated and maintained afterwards.

We take the electrical scope as a whole rather than as a set of separate jobs: design and specification, supply of the equipment, installation, testing and handover. Working that way is what keeps the parts consistent with each other — a protective device coordination study, for instance, is meaningless if the devices are then supplied and installed against a different arrangement than the one studied.

Projects are programmed in stages with the electrical work sequenced against the wider build. Where electrical work depends on equipment arriving or on civils being complete, that dependency is stated in the programme rather than discovered when the electricians arrive on site and the floor is not ready.

Handover is documentation: as-built drawings reflecting what was actually installed rather than what was designed, circuit and panel schedules, device settings, and test results. On an industrial installation that record is not a formality — it is what makes the plant maintainable by someone other than the original contractor.

How it is delivered

Delivered as a contracted electrical scope within a wider project, programmed in stages with dependencies on other trades stated up front. Handover includes as-built documentation, device settings and test results.

Questions about this service

Do you take the whole electrical scope or individual jobs?
We prefer the whole scope, because the parts of an industrial installation constrain each other. A protective-device coordination study is worthless if the devices are then supplied and installed against a different arrangement. Taking the scope as a whole is what keeps design, supply and installation consistent.
What do we receive at handover?
As-built drawings reflecting what was installed rather than what was designed, circuit and panel schedules, the settings of the protective and control devices, and the results of the tests carried out. On an industrial plant that record is what makes the installation maintainable by someone other than the contractor who built it.
Can you work alongside other contractors?
Yes, and on a plant it is usually unavoidable. The electrical programme is sequenced against the wider build, and where electrical work depends on equipment arriving or on civils being finished, that dependency is stated in the programme rather than discovered on site.